The plan is to demolish and rebuild the building in drywall construction for micro-offices. There is currently a large parking lot in front of the hall wing. The project envisages relocating the parking spaces underground in an underground garage, which will be accessed via a ramp.
This building is to be constructed from prefabricated timber modules. There is a large atrium in the middle of the first floor, which extends up to the top floor and brings light into the building. This atrium is covered with a glass roof and serves as a lobby and reception area for the micro-offices. The lobby has drinks and food vending machines for refreshments and social interaction.


